The Mark V Control System is a microprocessor-based distributed control system developed by General Electric (GE) for gas turbines, steam turbines, and combined-cycle power plants. It became one of the most widely installed turbine control platforms globally, especially from the late 1980s through the 2000s, and is still operating in many power plants today.

Control & Instrument Engineer
Electrical Engineer
Operation Supervisor & Operator
Maintenance Engineer
Power Plant Technical Support Team

• Lecturing and Class room session and Case Study
• Interactive sharing information and experience
• Group discussion, question and answer session

Trainer

Register
  • Code : MAY2612
  • Start Date : 11 Mei 2026
  • End Date : 13 Mei 2026
  • Location : BANDUNG
  • Duration: 3 Day
Training Includes
  • Meeting Packages
  • Training Materials
  • Lunch
  • Coffee Break
  • Certificate Attendance
  • Photo

Submit Your Details to Learn More About Mark V Control System For Power Plant

Sending Message...

Your Trust Training Partner

Join our proven programs designed to help professionals grow, comply with regulations, and excel in their careers.

Explore Trainings